To help communities plan for when their federally authorized projects will be constructed, USACE has developed a draft schedule of nearly 700 dredging projects – including navigation and flood risk management – that they consider likely to be constructed in the next five years. This includes projects that have funding committed from the disaster supplemental appropriations or FY18 USACE workplan or are likely to be funded in future work plans.
Below are two versions of the same document:
Both schedules are drafts. They make educated assumptions for start date, duration, estimated quantity of material and type of dredge, based on similar past projects.
(as of Aug. 6, 2018)
DRAFT USACE 5-year Shore Protection Schedule (Excel file, 59kb)
(as of Aug. 17, 2018)
DRAFT USACE 5 yr Schedule for All Projects (Excel file, 417kb)
Please consider joining the ASBPA.