Home   For the Media   Contact Us
Click here to learn more about ASBPA memberships.ASBPA is 100
Support ASBPA- Become a member!
ASBPAASBPAASBPAASBPA
  • About Us
    • Mission
    • Chapters
      • California Shore & Beach Preservation Association
      • Central Gulf Coast Chapter, ASBPA
      • Hawaii Shore and Beach Preservation Association
      • Mid-Atlantic Chapter, ASBPA
      • Northeast Shore and Beach Preservation Association
      • Students & New Professionals
      • Texas Chapter of ASBPA
      • PNW Chapter, ASBPA Coming Soon!
    • Leadership
    • Awards Programs
    • Partners
    • Committees
    • Support Us
  • Conferences
    • 2026 National Coastal Conference Conference
    • Future Meetings
    • Past Meetings
  • Resources
    • Shore & Beach Journal
    • Coastal Voice E-Newsletter
    • White Papers/Fact Sheets
    • ASBPA Tools
      • National Beach Nourishment Database
      • Coastal Universities Guide
      • National Tools Showcase
    • Southeast Coastal Communities Water Level Observation System
  • Members
    • Join or Renew
    • Our Members
  • Get Involved
    • ASBPA National Beach Sweep
    • Support Us
    • Science and Technology
    • Policy
    • Funding
    • Committees
    • Join or Renew Membership
    • Blue Flag USA

Recovery of the NJ marine transportation system in the wake of Superstorm Sandy: A 10-year retrospective

W. Scott Douglas, Genevieve Clifton, Joselyn Wall, Kelly Rosofsky, and Christopher Mullan, 2023. “Recovery of the NJ marine transportation system in the wake of Superstorm Sandy: A 10-year retrospective”, Shore & Beach, 91(4)/92(1), 55-61.

Access Shore & Beach Vol. 91, No. 4/ Vol. 92, No.1 (Double Issue)

ASBPA members have access to a full digital edition of Shore & Beach. Become a member now to get immediate access.

https://doi.org/10.34237/1009147

Recovery of the NJ marine transportation system in the wake of Superstorm Sandy: A 10-year retrospective
W. Scott Douglas(1) Genevieve Clifton(1), Joselyn Wall(1), Kelly Rosofsky(2), and Christopher Mullan(2)
1) New Jersey Department of Transportation, Office of Maritime Resources, P.O. Box 600, Trenton, NJ 08625.
2) Dewberry Engineers Inc., 600 Parsippany Road, Suite 301, Parsippany, NJ 07054.

The New Jersey Department of Transportation’s Office of Maritime Resources (NJDOT/ OMR) is responsible for operations and maintenance of more than 200 nautical miles (nmi) of shallow draft navigation channels in the Atlantic coastal region, as well as providing capacity for dredged material management to the U.S. Army Corps of Engineers to maintain the 117-mile New Jersey Intracoastal Waterway. When Superstorm Sandy made landfall in fall 2012, an estimated $65 million in damage was caused to state infrastructure in the form of severe shoaling, shoreline erosion, and berm loss on confined disposal facilities. In the decade since, the NJDOT/OMR has dredged 1.9 million CY of sediment and beneficially used over half of that in resiliency projects ranging from shoreline stabilization and marsh enhancement to restoration of shallow water habitat at a cost of over $120 million. Another 2.0 million CY of sediment has been dredged by the U.S. Army Corps of Engineers (USACE) in the same timeframe, with 60% being used in resiliency projects. In addition to these projects, NJDOT also repaired and strengthened five confined disposal facilities, improved storm preparedness, and created a pathway toward a more sustainable maintenance program for New Jersey’s waterways. A summary of these projects is presented, along with lessons learned and considerations for dredging and beneficial-use practitioners.

 

BECOME A MEMBER!

Please consider joining the ASBPA.

CLICK TO LEARN MORE

 

QUICK LINKS

News

Next Conference

Members

About Us

Back to Top

CONTACT US

General Inquiries

For the Media

Facebook
Twitter
Instagram
  • Next Conference
  • Members
  • About Us
  • ASBPA Non-Discrimination Statement
  • Back to Top
Copyright ASBPA 2024 | Privacy Policy | Terms & Conditions View our latest 990